| Date |
Entry |
| 05 Nov 2004 |
We're finally home!
|
| 27 Oct 2004 |
Final walkthrough, punch list pretty much done
|
| 25 Oct 2004 |
First walkthrough, punch list mightily expanded
|
| 12 Oct 2004 |
Laminate flooring installation mostly completed
|
| 11 Oct 2004 |
Garage door installed, vapor barrier laid down
|
| 08 Oct 2004 |
Lot build-up begins
|
| 07 Oct 2004 |
Closet shelf installation begins, miscellaneous hardware installed
|
| 06 Oct 2004 |
Laminate flooring installed in kitchen, start install laminate in dining room
|
| 05 Oct 2004 |
Major inspections required by Garner completed
|
| 04 Oct 2004 |
Marble sink installed and above-sink lighting fixture installed in lower bath
|
| 01 Oct 2004 |
Electrical trim-out, electric mains tested (we have light, people!)
|
| 30 Sep 2004 |
Doorbell installed
|
| 29 Sep 2004 |
Sink/tub fixtures installed, laundry room window framed
|
| 28 Sep 2004 |
Garage sink / toilets / disposer / dishwasher / laundry drain pan / outside lights installed
|
| 27 Sep 2004 |
Interior light fixtures hung, solid surface countertops for kitchen installed, laminate flooring laid in lower bath
|
| 21 Sep 2004 |
Both A/C units installed, entry door to master bath reversed
|
| 20 Sep 2004 |
Driveway and sidewalks poured, A/C foundation slabs installed
|
| 17 Sep 2004 |
A/C ducts installed, thermostats installed, door locks installed
|
| 16 Sep 2004 |
Garage door to kitchen installed, vinyl installed in master bath, upstairs bath, laundry room
|
| 15 Sep 2004 |
Cultured marble sinks installed in master bath, upstairs bath
|
| 11 Sep 2004 |
Painting completed
|
| 09 Sep 2004 |
Painting in progress, marble for master bath is installed
|
| 08 Sep 2004 |
Doors, baseboards, and casings hung, cabinets for kitchen and washrooms installed, kitchen island installed
|
| 07 Sep 2004 |
Kitchen/washroom cabinets arrive, door/baseboard installation begins
|
| 04 Sep 2004 |
Doors and baseboards arrive
|
| 02 Sep 2004 |
Taping/mudding complete, awaiting finishing for walls, deck/garage stairs/front stair rail complete
|
| 01 Sep 2004 |
Current house sold!
|
| 29 Aug 2004 |
Taping/mudding begins, deck installation begins
|
| 27 Aug 2004 |
Moving van arrives at current house to take our stuff to storage!
|
| 26 Aug 2004 |
Sheet rock hung, awaiting taping/mudding, cement poured for front steps, master shower pan laid (4'x4' cultured marble...WOO HOO!)
|
| 25 Aug 2004 |
Water/sewer utility connection complete, Lots 11 and 14 cleared
|
| 23 Aug 2004 |
Sheet rock installation begins
|
| 20 Aug 2004 |
Wall insulation complete
|
| 19 Aug 2004 |
Sheet rock supplies arrive, wall insulation begins
|
| 18 Aug 2004 |
Lighting fixture selections completed
|
| 16 Aug 2004 |
Permanent stairs installed
|
| 09 Aug 2004 |
Electrical rough-in completed, siding and window installation completed, security system pre-wire completed
|
| 07 Aug 2004 |
Siding and window installation begins
|
| 06 Aug 2004 |
Leviton structured media panel installed
|
| 05 Aug 2004 |
Electrical rough-in work begins
|
| 04 Aug 2004 |
Electrical walk-through and recepticle/wiring decisions made
|
| 03 Aug 2004 |
Siding and window installation begins
|
| 30 Jul 2004 |
Temporary stairs in place, shingling contines, rough-in plumbing done
|
| 28 Jul 2004 |
Roof framing completed, shingling begins!
|
| 27 Jul 2004 |
Second floor framing done, roof framing begins!
|
| 26 Jul 2004 |
First floor framing done, second floor framing half done!
|
| 25 Jul 2004 |
First floor framing complete, second floor begins
|
| 22 Jul 2004 |
First floor framing in progress
|
| 21 Jul 2004 |
First floor joists in place, garage floor paved, framing begins!
|
| 19 Jul 2004 |
Preparing for framing the house
- Foundation (office, front)
- Foundation (office, side angle)
- Foundation (porch cavity)
- Foundation (dining room, side view)
- Foundation (center to left side)
- Foundation (kitchen, side angle)
- Foundation (family room, side angle)
- Foundation (garage)
- Foundation (guest bedroom, side angle)
- Foundation (guest bedroom, rear)
- Foundation (kitchen, side angle)
- Foundation (garage, side angle)
- Foundation (dining room/porch, front)
- Foundation (stairs, front)
|
| 17 Jul 2004 |
Front stairs built, foundation complete
|
| 16 Jul 2004 |
Foundation in progress
|
| 14 Jul 2004 |
Foundation started
|
| 13 Jul 2004 |
Roof joists and foundation materials on site
|
| 09 Jul 2004 |
Electricity now on-site, footings for foundation poured
|
| 08 Jul 2004 |
Deal completed on current house, closing 1 Sep 2004
|
| 07 Jul 2004 |
Cash offer made to purchase current house
|
| 03 Jul 2004 |
Underground telephone cable installed
|
| 01 Jul 2004 |
Temporary electric board installed
|
| 24 Jun 2004 |
Footprint of house marked!
|
| 23 Jun 2004 |
Inspections box in place!
|
| 21-22 Jun 2004 |
Clearing the lot!
|
| 18 Jun 2004 |
Picking the Interior Appointments
|
| 16 Jun 2004 |
Scouting the Interior Appointments
|
| 06 Jun 2004 |
The Good Life at a Great Price™ :)
|
| 04 Jun 2004 |
One large contract, one larger house in five months!
|
| 29 May 2004 |
Nicholas' Nutball Father Camps Out for New House Lot!
|